Regional Resource Adequacy

A coalition of self-organized EDAM BAAs and EDAM leaning BAAs are facilitating an initial stakeholder process to develop a regional Resource Adequacy proposal. The intent of the proposal is to design a voluntary, interoperable program to leverage the EDAM footprint and complement EDAM’s market-based efficiencies while ensuring that each participant maintains sufficient physical and contractual capacity to reliably meet its load obligations under a wide range of system conditions. This group has organized itself into an RA Sponsor group (EDAM BAAs and EDAM Leaning BAAs) and established a Work Group made up of additional potential program participants, to partner with stakeholders in designing this program. The Resource Adequacy proposal will be developed through the fall, and presented to the initial ROWE Board for consideration and implementation.  

Regional Resource Adequacy

A coalition of self-organized EDAM BAAs and EDAM leaning BAAs are facilitating an initial stakeholder process to develop a regional Resource Adequacy proposal. The intent of the proposal is to design a voluntary, interoperable program to leverage the EDAM footprint and complement EDAM’s market-based efficiencies while ensuring that each participant maintains sufficient physical and contractual capacity to reliably meet its load obligations under a wide range of system conditions. This group has organized itself into an RA Sponsor group (EDAM BAAs and EDAM Leaning BAAs) and established a Work Group made up of additional potential program participants, to partner with stakeholders in designing this program. The Resource Adequacy proposal will be developed through the fall, and presented to the initial ROWE Board for consideration and implementation.  

Ways to Participate In the Process

We need your input. For questions about this work, how to participate, or to submit comments, please reach out to resourceadequacy@rowesternenergy.org or sdavis@utilicast.com.  

 

A stakeholder process consisting of public, virtual workshops and opportunities for written comment will take place through the fall. 

 

Below are upcoming workshops with the call-in information:

Workshop #12: Technical Design and Compliance
Date: September 10
Time: 9:00-12:00PT/10:00-1:00MT
Zoom link: https://zoom.us/j/99633253500?pwd=p0kYoJk9FsoEw9RMs3pU0FP7Y15Tfm.1

 

Workshop #13: Updates on Governance, Technical Design, Transmission, Compliance, and Data
Date: September 17
Time: 9:00-12:00PT/10:00-1:00MT
Zoom link: https://zoom.us/j/94655485185?pwd=kUcTgcw1VFbB51mnNXCOVDiiEIjUqR.1

Background Documents and Workshop Materials

Revised Governance Proposal

 

Comments of Joint Clean Energy and Environmental Parties on July Workshops

 

Workshop #11: Transmission and Governance | Slides and Recording

 

Transmission Requirement Draft Straw Proposal

 

Workshop #10: Technical Design | Slides and Recording

 

Workshop #9: Transmission and Compliance | Slides and Recording

 

Revised Foundational Principles

 

Program Flow Diagram

 

Workshop #8: Value Proposition | Slides and Recording

 

Workshop #7: ROWE Structure and Framework | Slides and Recording

 

Workshop #6: Initial Stakeholder Process Timeline Update and Summer/Fall Workshops | Slides and Recording

 

Spring Workshop Stakeholder Comments

 

Workshop #5: Transmission, Compliance Structure, Reporting and Transparency | Slides and Recording

 

Workshop #4: Contracts, Compliance Submittal Requirements, and Load Forecasting | Slides and Recording

 

Workshop #3: Modeling and Metrics; Resource Qualification Requirements | Slides and Recording

 

Consideration Design Document: Compliance Structure; Reporting and Transparency

 

Consideration Design Document: Compliance Submittal Requirements, Load Forecasting, and Transmission

 

Consideration Design Document: RA Modeling and Metrics; Resource Qualification Requirements

 

Consideration Design Document: Governance

 

Workshop #2: RA Primer, Foundational Principles, and Governance | Slides and Recording

 

Workshop #1: Program Overview | Slides and Recording

 

Program Overview Document

 

Stakeholder Comment Document

 

BOSR Letter

 

RIF Presentation

Contact Us

For questions, including press inquiries, please reach out to: info@ROWesternEnergy.org

 

For Pathways Initiative information including monthly stakeholder meetings, visit https://www.westernenergyboard.org/wwgpi/.

 

For information about the CAISO and the Western Energy Imbalance Market (WEIM) and Extended Day Ahead Market (EDAM), visit https://www.caiso.com/